Select Page

Things we should have given more thought and had detailed in our plans so we don’t have to rush the decision or regret what we’ve go:

Fireplace/Mantle – Had no particular layout or plan yet, but had to decide so framing can build out the fireplace rough-in.  Widened it to 7′.

Vaulted Ceiling Trusses – We vaulted the living room ceiling in such a way that installing faux beams will be difficult because we have no great way to terminate the beam into drywall.

Framing should be complete by the end of tomorrow or early Monday.  Still have numerous windows to install as will as roof trusses and sheeting…