Select Page

We met our realtor and went to Fred Myer to get house staging items.  On our way home, our survey company informed us that Mylars had been released and were ready to be signed, YEAH!  We signed and I ran it over to another engineer to get their signature in Meridian.  Upon returning the mylars to our surveyor, he informed me that I would have to track down the district health inspector to get his signature.  When I called him, he told me that my test hole today had been a disaster and we’ll need to schedule a meeting with my septic company.  Horrible.  We did finally get the nearly finalized floor plans, which looked great.  A few minor revisions were added and we should get rolling on elevations soon.